We started by taking down the concrete tiles on the exterior of the building, then the metal brackets (which we are saving for scrap!)
What we have discovered is that the building is a complete and utter botch job! There is no way this has received building control sign off and some parts of the metal trim and drainage are just a balancing !
Now to disconnect the electrics and water and we will rip it down!

No comments:
Post a Comment